1. TOP
  2. Job References
  3. Mito City Hall Main Building

Mito City Hall Main Building

We switched from heavy phosphate-treated steel sheets to Artellion, which has high design reproducibility. The lightweight design makes it easier to move around and transport, and the construction cost reduction effect was highly evaluated.

  • Mito City Hall Main Building Construction Photo 01

  • Mito City Hall Main Building Construction Photo 02

  • Mito City Hall Main Building Construction Photo 03

  • Mito City Hall Main Building Construction Photo 04

  • Mito City Hall Main Building Construction Photo 05

Case Information

Design
Kume & Shiba Architectural Design JV
Installation
Taisei Construction Co., Ltd., Kabuki Construction Co., Ltd., Showa Construction Co., Ltd., Cosmo Construction Co., Ltd., and Sugawara Construction Co., Ltd. JV
Location
1-4-1 Chuo, Mito City, Ibaraki Prefecture
Construction date
2018

The design used

Processing method used

Taking advantage of the properties of aluminum, it can be processed into a variety of shapes suitable for construction.

Folding

Because the printing is done directly on the aluminium plate, the colour and pattern will stay in place even when it is bent. Unlike cut panels, no undercoat is required, which offers cost benefits.
・We recommend using 2mm thick plate material for bending.
・We recommend verifying the processing prior to mass production.
- When cutting the plate, we recommend touching up the edges with ambient-drying fluorine paint.

Click here for details on bending

Examples of similar products

Sectors

Features